Yass sits inside our established Canberra service area — we have been installing here and across the surrounding district since 2021.
Yass is in Essential Energy’s network, which works differently to the ACT next door. Essential’s export limit is 5 kW, and on three-phase supply that 5 kW is the limit for the whole system rather than per phase. That is a meaningful difference from Evoenergy across the border, and it changes how a larger system should be specified.
Checked against Essential Energy’s current published connection requirements on 2 September 2026. Network rules change — we re-check before every quote.
A short list, and deliberately so — we are new to this area and would rather show you the real number than imply a history we do not have.
A phone consultation with your roof on the screen in front of us. By the end of it you will know what your home qualifies for and what that means on your bills — and you decide once you have seen your numbers.
Have a recent power bill nearby, and a photo of your switchboard if you can.
Over 1,200 systems since 2021 across the ACT, Tasmania and New South Wales.
Average rating on Google · 128 reviewsverified against the live Google Business Profile, 31 Jul 2026
Read them on Google →