Yass sits inside our established Canberra service area — we have been installing here and across the surrounding district since 2021.

Yass is in Essential Energy’s network, which works differently to the ACT next door. Essential’s export limit is 5 kW, and on three-phase supply that 5 kW is the limit for the whole system rather than per phase. That is a meaningful difference from Evoenergy across the border, and it changes how a larger system should be specified.

What your network allows

Distributor
Essential Energy
Export limit — single phase
5 kW
Export limit — three phase
5 kW for the whole system
Inverter size
Assessed per site by voltage-rise calculation
Flexible exports
From late 2026 — 1.5 to 10 kW per phase, varying through the day
Emergency backstop
From late 2026, rolled out by postcode
Network connection fee
$53.16 incl. GST where auto-approved

Checked against Essential Energy’s current published connection requirements on 2 September 2026. Network rules change — we re-check before every quote.

Work we’ve already done nearby

  • Yass — 5 systems
  • Murrumbateman — 2 systems
  • Gundaroo — 1 system

A short list, and deliberately so — we are new to this area and would rather show you the real number than imply a history we do not have.

Find out what your roof is worth

A phone consultation with your roof on the screen in front of us. By the end of it you will know what your home qualifies for and what that means on your bills — and you decide once you have seen your numbers.

Have a recent power bill nearby, and a photo of your switchboard if you can.

Book an assessment

4.8

Average rating on Google · 128 reviewsverified against the live Google Business Profile, 31 Jul 2026

Read them on Google →