Astra is now taking work across Wollongong and the Illawarra.

New service area. Astra has been installing since 2021 — over 1,200 systems across the ACT, Tasmania and southern New South Wales. We are now taking work here. Everything below about your network is current and checked; what we do not yet have is a long list of local jobs, and we would rather say so.

The Illawarra is Endeavour Energy territory. Endeavour’s standard export limit is 5 kW on single phase, but from late 2026 flexible exports become the default connection offer — allowing up to 10 kW most of the time, provided the system uses a smart inverter with an active internet connection.

If you are installing now, that is a specification decision worth getting right the first time. A system fitted without a compatible inverter cannot take advantage of the higher limit when it arrives.

What your network allows

Distributor
Endeavour Energy
Export limit — single phase
5 kW fixed
Export limit — three phase
Assessed per site
Inverter size
10 kW single phase · 30 kW three phase
Flexible exports
Becoming the default from late 2026 — up to 10 kW with a smart inverter and internet
Emergency backstop
NSW mechanism from late 2026
Network connection fee
$34.97 incl. GST

Checked against Endeavour Energy’s current published connection requirements on 2 September 2026. Network rules change — we re-check before every quote.

Find out what your roof is worth

A phone consultation with your roof on the screen in front of us. By the end of it you will know what your home qualifies for and what that means on your bills — and you decide once you have seen your numbers.

Have a recent power bill nearby, and a photo of your switchboard if you can.

Book an assessment