Astra is now taking work across the Central Coast, from Gosford and Wyong through the surrounding suburbs.
The Central Coast is Ausgrid territory, which means a 10 kW export limit on single phase — the most generous available anywhere in New South Wales. Worth knowing before anyone sizes you to a 5 kW assumption.
Ausgrid has set 31 December 2026 as the deadline for approved systems to be installed and commissioned. After that a fresh application is needed under the new emergency-backstop rules.
Checked against Ausgrid’s current published connection requirements on 2 September 2026. Network rules change — we re-check before every quote.
A phone consultation with your roof on the screen in front of us. By the end of it you will know what your home qualifies for and what that means on your bills — and you decide once you have seen your numbers.
Have a recent power bill nearby, and a photo of your switchboard if you can.
Over 1,200 systems since 2021 across the ACT, Tasmania and New South Wales.
Average rating on Google · 128 reviewsverified against the live Google Business Profile, 31 Jul 2026
Read them on Google →