Astra is now taking work across the Central Coast, from Gosford and Wyong through the surrounding suburbs.

New service area. Astra has been installing since 2021 — over 1,200 systems across the ACT, Tasmania and southern New South Wales. We are now taking work here. Everything below about your network is current and checked; what we do not yet have is a long list of local jobs, and we would rather say so.

The Central Coast is Ausgrid territory, which means a 10 kW export limit on single phase — the most generous available anywhere in New South Wales. Worth knowing before anyone sizes you to a 5 kW assumption.

Ausgrid has set 31 December 2026 as the deadline for approved systems to be installed and commissioned. After that a fresh application is needed under the new emergency-backstop rules.

What your network allows

Distributor
Ausgrid
Export limit — single phase
10 kW
Export limit — three phase
10 kW per phase
Inverter size
10 kW under the streamlined approval path
Flexible exports
Not offered
Emergency backstop
NSW mechanism from late 2026
Network connection fee

Checked against Ausgrid’s current published connection requirements on 2 September 2026. Network rules change — we re-check before every quote.

Find out what your roof is worth

A phone consultation with your roof on the screen in front of us. By the end of it you will know what your home qualifies for and what that means on your bills — and you decide once you have seen your numbers.

Have a recent power bill nearby, and a photo of your switchboard if you can.